I wished the small green colored bar showing the progress under the Preview Image would a bit wider. Right now, it is only a small fine line, and the progress is not really visible.
Just a thought but it has been bugging me since the beginning.

Werner
Offline
#2 Gunther
Hi Werner, you mean the indicators for the visual preview generation below the preview, I suppose?

You are right, the green "dots" (which indicate that the visual previews for those images have been successfully generated), is not as thick and visible as the yellow dots (Visual Previews are being generated) or the red dots (Visual Previews failed).
I made this on purpose, to make the green line less obtrusive.

I see it from the opposite side, like "if there are no yellow or red dots, everything is ok" and the VP are finished. The green then doesn't need so very visible.

Also below that line you see an indicator with the percentage of Visual Previews already generated and the remaining images with VP to generate as numbers.

Personally, I feel that a thicker green line would not look very nice. Can you follow my thoughts about this?